Electromechanical assembly of the new polyduct to service the Torre Arenillas tanker quay at Cepsa’s La Rábida Energy Park facilities in Palos de la Frontera (Huelva).
This large-scale project involves the implementation of a number of specialised tasks. The installation of 700 tonnes of structures and supports, the connection of 28,000 metres of pipework distributed in 10 lines with diameters ranging from 10 to 20 inches and the laying of 16,500 linear metres of cable and fibre optics. In addition, existing installations will be modified to adapt them to the new layout.