Design, implementation, supervision and control of the civil works for the Salto de Chira hydroelectric pumping station. This ambitious project encompasses the initial design to the operation of the plant, including the detailed design taking account of the geographical and topographical features of Salto de Chira. The project also includes the engineering necessary for the construction of the civil infrastructure, as well as the supply, installation and commissioning of the electromechanical equipment essential for the optimal operation of the plant.

Imagen 1
Imagen 2
Imagen 3
Imagen 4