Design, construction and commissioning of the HVDC substation with ±500 kV, 1300 MW line-commutated converter (LCC) technology in Tajikistan.
Design, construction and commissioning of the ±500 kV, 1300 MW HVDC substation in Pakistan.
Detailed engineering has also been conducted for the construction of the new Sangtuda HVDC and transmission substation, with a 500 kV switchyard with one and a half breakers and a 220 kV switchyard with double busbars. IEC 61850 compliant digital substation control and protection solution.