Engineering (including concept and basic design), purchase of equipment and materials, construction, loading, transport and installation, testing and commissioning of the BorWin5 HVDC (High Voltage Direct Current) Platform and associated jacket. The project consists of a power transmission system with a capacity of 900 megawatts, located near the He Dreiht offshore wind farm off the island of Borkum on the German North Sea coast. The project includes a heliport and an accommodation module with all the basic services necessary for the rest and comfort of the technical maintenance staff who, once a year, supervise the proper functioning of the platform.

Imagen 1
Imagen 2
Imagen 3
Imagen 4